The Highway 43 bridge in Winona continues to have some temporary lane closures and delays.
The Minnesota Department of Transportation says it's conducting their annual bridge inspection.
The inspection requires a lane closure and traffic will continue to be reduced to one lane controlled by flaggers between 8:00 a.m. and 5:00 p.m. Both lanes will be open each evening after the work is completed.
The inspection and closures are expected to last through this Friday.